THE BEGINNING STAGES OF THE BUILDING OF OUR HOUSE!!!

cold storage

where the basement shower/toilet washer will be.

walkout basement entrance

view of the basement and basement entrance

the plumbing is in ready for cement.
The very first stages of framing.

the small single garage

first part of framing the garages

some framing going on

view of basement before framing

view of the walkout basement

view from the back right side of house

the cold storage
FRAMING
The basement is completely framed, now on to the main floor.

the whole front view

3 car garage

the 3 car garage

view of the front porch

the view from the rear.
No comments:
Post a Comment